Progress documentation
Recurring flights over an active build, delivered as a dated orthomosaic and a quantities record — a defensible visual history of the job.
We fly the site on a fixed cadence and deliver a dated orthomosaic plus a progress report within 72 hours of each flight. Every flight is flown on the same route so the record is comparable month to month.
- Delivered as
- Ortho · PDF report
- Turnaround
- monthly cadence
- Flown with
- Fixed corridor route
- Accuracy
- Visual record
What you get
§ Deliverables- Dated orthomosaic
- GeoTIFF and PDF, same footprint every flight
- Progress report
- PDF with the current surface, quantities moved since last flight, and side-by-side comparison
- Volume tracking
- Cut and fill since the previous flight, for pay applications and internal tracking
- Archive
- Every prior flight stays available in your portal for the life of the project
What we need from you
§ Inputs- 01Site limits and the flight cadence you want
- 02Program length, or the milestone the flights run through
- 03Who receives each month's package
- 04Site access and the superintendent's contact
- 05Any airspace constraints you already know about
How it runs
§ Process- 01
Set the route
One flight plan, flown identically every time, so the record is comparable.
- 02
Recurring flights
Monthly, biweekly or weekly. Weather holds reschedule to the next clear day.
- 03
Report
Ortho, surface and volumes moved since the last flight, within 72 hours.
- 04
Archive
Every flight stays in the portal — useful long after the job closes.
Questions we get
§ FAQ- How quickly do we get each month's package?
- Within 72 hours of the flight. Rush is quoted per job.
- Can this support pay applications?
- It gives you a dated, measured record of what moved between flights. Whether that satisfies a specific pay app is between you and the owner.
- What happens when weather holds a flight?
- It reschedules to the next clear day and the cadence stays on its original schedule.
- How long do you keep the imagery?
- Every flight stays available in your portal for the life of the project, and heavy files are delivered as links rather than downloads.
Other services
§ AlsoEarthwork takeoffs
Quantity report · surface · 72 hr
Aerial topographic mapping
Surface · contours · 72 hr
Machine control models
TP3 · GP3 · 72 hr
Bidding a progress documentation?
Send the plan set — the form already knows what this job needs.