01
Earthwork takeoffs
Cut/fill quantities measured from a flown existing-ground surface and compared against your design. You get the full quantity report, not just the surface.
Out: Quantity report · surface
Lead: 72 hr
Details →Lead: 72 hr
Each one is a different job with different inputs and a different clock. Pick the one that matches what you're bidding — the intake form changes to suit it.
Cut/fill quantities measured from a flown existing-ground surface and compared against your design. You get the full quantity report, not just the surface.
Existing-conditions surface and contours for a site. Ground control set on site, or tied to control you provide.
Design surfaces built from your plan set and written out for the grade control on your iron — Trimble, Topcon, Leica or John Deere.
Recurring flights over an active build, delivered as a dated orthomosaic and a quantities record.
| Service | Flown with | Delivered as | Accuracy | Turnaround |
|---|---|---|---|---|
| Earthwork takeoffs | RTK quadcopter | Quantity report · surface | ±0.1 ft | 72 hr |
| Aerial topographic mapping | RTK + GCP | Surface · contours | ±0.1 ft | 72 hr |
| Machine control models | Plan set + control | TP3 · GP3 | Design grade | 72 hr |
| Progress documentation | Fixed corridor route | Ortho · PDF report | Visual record | monthly cadence |
Uploads to 200 MB · no account required · quote back within 24 hours